Yesterday and today we reduced the size of an okd washdown bay which was posing a trip hazard.
Work involved removing the grids and cleaning the area beneath them. We then pkaced them back in position and reduced their size by means of cutting hem with a oxy-cetylene torch. The steps were to remove the supporting i-beam, fill the hole with some recycled road material, compacting this and then pouring cement over.
No comments:
Post a Comment