Thursday, 23 October 2014

Re-laying turf after drainage installation

After a week of open trenches we are finally re-laying the turf and closing the trenches. Notice how the turf is intentionally laid higher than ground level in order to allow for any settling of the material that was placed in the trenches. Ideally after some time these mounds will settle to the same level as the ground beside them.

No comments:

Post a Comment